Product Parameters
|
Model |
24V 100Ah |
24V 150Ah |
24V 200Ah |
24V 230Ah |
24V 280Ah |
24V 314Ah |
| Rated Voltage |
25.6V |
|||||
|
Nominal Capacity |
100Ah |
150Ah |
200Ah |
230Ah |
280Ah |
314Ah |
| Energy | 2.56kWh | 3.84kWh | 5.12kWh | 5.888kWh | 7.168kWh | 8.038kWh |
| Cycle Life |
5000~8000+ Cycles
|
|||||
| BMS Protection Function |
Built-in Smart BMS + Bluetooth App
|
|||||
| Charge-end-off Voltage |
29.2V |
|||||
| Max. Continuous Charging Current |
100A |
150A |
200A |
200A |
200A |
200A |
|
Max. Continuous Discharging Current |
100A |
150A |
200A |
200A |
200A |
200A |
|
Peak Discharge Current |
200A(3S) |
300A(3S) |
400A(3S) |
400A(3S) |
400A(3S) |
400A(3S) |
| Charge Temperature |
0-55℃ |
|||||
| Discharge Temperature |
-20-60℃ |
|||||
| Storage Temperature |
Within 2 months:-20℃~40℃,Within 6 months:-10-35℃ |
|||||
|
Communication Port |
Optional CAN/RS485/RS232/RJ45 |
|||||
Features
One 25.6V platform, six capacities, one bill of materials. A distributor can cover a compact campervan and a 40-foot liner from a single product family — 2.56kWh to 8.03kWh, one BMS platform, one charger profile, one datasheet, one spare-parts story. That is fewer SKUs on the shelf and one conversation at the counter instead of six.
2. The heating circuit is the warranty line, not a feature bullet. Most lithium returns from cold markets trace back to one event: a pack got charged while frozen, or a charger kept trying to. The heater removes that scenario, because the BMS will not let current into cold cells. For a dealer this is a claim category that stops happening, in the season when air-freighting a replacement is most expensive.
3. 200A continuous means one pack, not two. At 25.6V, 200A is 5.1kW on the DC side. A 3kW inverter runs with headroom and no second pack in parallel. Where a 5kW inverter is specified, the honest answer is two packs or a conversation about duty cycle — we would rather say that on the page than have an installer discover it at commissioning.
4. Half the parallel strings, half the balance problems. Storing 8kWh at 12V takes two 314Ah packs in parallel: four interconnect cables, two BMS boards, and two packs that age at slightly different rates. At 25.6V it is one pack with one 8S BMS balancing all cells together. Fewer connections is also fewer places for a loose terminal to heat up.
5. The app answers the support call before it is made. Bluetooth shows state of charge, voltage, current, power, cell temperatures and cycle index. Most "the battery is dead" calls turn out to be a tripped breaker, a charger on the wrong profile, or a heating cycle the customer did not know was running. The service desk can see all three from a phone. CAN / RS485 / RS232 / RJ45 are available where the pack has to talk to a Victron system, a display or a fleet gateway.
6. Export paperwork that matches what actually ships. UN38.3 reports and MSDS issued per batch rather than recycled from an old file, CE and RoHS certificates on hand, and shipping documents prepared for the classification this product actually carries. If your forwarder wants something specific, tell us before the booking — it is cheaper than a container sitting at port.
Applications
European 24V motorhomes and liner-class builds — house bank for coaches that are already wired at 24V, where the inverter load is measured in kilowatts
Expedition and overland vehicles — one pack where a 12V build would need two, in a compartment that is usually outside the heated envelope
Campervan conversions specified at 24V — induction cooking, diesel heater, Starlink, no generator
Marine and liveaboard — 24V is the standard boat voltage; wet lockers and bilges are exactly where IP-rated hardware and cold-morning charging both matter
Off-grid cabins and backup power — unheated enclosures where solar has to work in sub-zero weather
Rental and tour fleets — mixed vehicles on one capacity family, heating handled without the driver knowing it exists
Ski-season and year-round conversions — vans built to be used in February, not just July
FAQ
A: Sample orders start at 1 set, with small batches of 50 sets and large batches of 500 sets or more. We understand the needs of partners of all sizes.
A: We accept payment for samples, and the sample fee will be refunded upon placement of a bulk order. Sample lead time is 7–10 days
A: Standard dimension and terminals support direct replacement, no complicated wiring changes required.
A: Supports multi-unit parallel connection to upgrade total capacity, matching various RV power needs.
A: Built-in BMS temperature protection ensures stable operation in hot and cold outdoor environments.
A: Compatible with solar panel, vehicle generator and shore power for flexible daily charging.
A: Durable lithium cells with full safety protection cut maintenance issues and replacement costs.
A: We provide a complete set of certified scanned copies and test report summaries, with UN 38.3 test reports and MSDS documents included for each batch.







